Home Dot Cam 

Story

Loop 375 Closures

Loop 375 Closures:

BASE REPAIR / MILL & INLAY PROJECT:
The following closures will be in place Monday, April 20 through Friday, April 25 throughout the day, between 3 a.m. and 4 p.m., on a “need basis only.”

Eastbound closures César Chávez Border Highway (Loop 375):
Right lane and shoulder closures at alternate times, between Fonseca and Zaragoza Fonseca Exit/ Entrance Ramps Midway Exit/ Entrance Ramps Yarbrough Exit/ Entrance Ramps
Padres Exit / Entrance Ramps
Zaragoza Exit/ Entrance Ramps

NOTE: No two consecutive ramps will be closed at the same time.

The westbound left lane on César Chávez Border Highway (Loop 375), between the Zaragoza Overpass and US 54 will be closed daily Monday, April 20 through Saturday, April 25 from 9 a.m. to 6 a.m. (the following morning).

The closure is necessary to repair and resurface the roadway.

TRANSMOUNTAIN (LOOP 375) PROJECT:
The following Woodrow Bean TransMountain Dr. (Loop 375) closures will be in place Monday, April 20 through Friday, April 24 from 9 a.m. to 6 p.m.:

Westbound:
Alternate right and left lane closures between Bomarc St. and Alcan Rd.
Bomarc Entrance Ramp

All westbound traffic will need to exit at the Dyer/McCombs Exit Ramp.

Eastbound: Right and left lane closures at alternate times, between Alcan Rd. and Railroad Dr.
Alcan Entrance Ramp (Purple Heart Memorial Highway-Loop 375)
Bomarc Entrance Ramp

The above closures are necessary for the rehabilitation of the roadway.

Traffic Forum

Tell us about traffic in your area of town! This forum is always open for traffic reports. Full Story ››


More Headlines

Tribute To Courage

Tribute to Courage is a slide show honoring the men and women fighting the war against terrorism. Upload and share your military photos! Full Story ››

Brenda Medina

Brenda Medina is the only El Paso-Las Cruces reporter dedicated to covering traffic. Check out her coverage here, and watch for her live reports every ten minutes, on The KFOX Morning News.Full Story ››